Project of installation 21
Installation from the material reception, transport to the densimetric separator and transport to the storage line.
INSTALLED MACHINERY.
• CONVEYOR BELT MODEL TLP-1500.
• STRUCTURES WHICH SUPPORT THE MACHINERY.
• DENSIMETRIC SEPARATOR MODEL DSD-B-2000-MONO
• CONVEYOR BELT MODEL TLP-1000.