PROJECT OF INSTALLATION 14
Dosing installation of biomass to the main burner of the kiln.
INSTALLED MACHINERY:
• MODIFICATION SCREW CONVEYOR GOTTWALD SES-E2/89-400-11.
• STRUCTURES WHICH SUPPORT THE MACHINERY.
• CONVEYOR BELT MODEL TLP-1000, LENGTH ACCORDING TO THE INSTALLATION.
• SCREW CONVEYOR DOMENECH ASR-630.4500 DOUBLE DRIVE.
• KNIFE GATE VALVE MODEL, VSG-600 ALT-150.
• ROTARY VALVE ALV-80.80.
• BAGHOUSE FMD-130.20 L2000.