Installation made in Algeria for a production of 200 tonnes during 24 hours worked, producing gypsum and plaster, storing the finished product and packing it for the storage and distribution.
INSTALLED MACHINERY:
• GRINDING-SEPARATING SECTION OF CRUDE MATERIAL.
• BAKING SECTION WITH KILN HT-200 TN (INDIRECT FIRED ROTARY KILN).
• ENSILAGE SECTION OF FINISHED PLASTER.
• PACKING SECTION OF FINISHED PRODUCT.
• RE-SHREDDING-SEPARATING SECTION OF BAKED MATERIAL.